Mobile
Log In Sign Up
Home > english-chinese > "excavated out" in Chinese

Chinese translation for "excavated out"

挖除

Related Translations:
excavating:  挖掘的挖取
excavate:  vt.1.开凿,挖掘。2.掘出,发掘。vi.1.凿,掘开。2.变成空洞。
excavate excavate:  被提高的
excavating tools:  挖掘工具
cutting excavate:  开凿
excavating cableway:  开挖用索道
excavating plant:  开挖设备挖土机械设备
excavating machine:  开挖机械挖掘机
excavating plough:  挖掘犁
template excavate:  模板挖掘机
Example Sentences:
1.The ruins of ancient rome were excavated out
古罗马的遗迹被发掘出来了。
2.The jiaotanxia kiln is firstly discovered in the west foot of hangzhou turtle hill in 1930 . from 1985 to 1986 , the archaeological studying group of southern song linan city carried a complete archaeological study of this kiln relic , and excavated out pugging pond , biscuit fire furnace , shaping workshop , glaze vats , and other relics , and discovered a dragon kiln , unearthed a good amount of practical specimens of porcelain shards and kiln tools
郊坛下窑址早在1930年在杭州乌山西麓被首次发现, 1985年1986年南宋临安城考古队对窑址进行了全面考古发掘,发掘出练泥池素烧炉成型工房釉缸等作坊遗迹和一座窑,出土了大量瓷片窑具等实物标本。
3.The paper analyzed the characters , the backgrounds and the functions of the educational criticism , and excavates out the cause , the specialty and the shortage of educational criticism flourish at the turn of the century . based on these analyses some suggestion were put forward , which was very meaningful for educational criticism itself and the development of education
因此,解读教育批评的内涵、产生机理及其功能,剖析世纪之交教育批评的现状,探索新世纪的教育批评的发展走势和教育批评引起的教育反思,无论对于教育批评理论的丰富,还是对于教育改革实践的推进,都具有非常重要的意义和价值。
4.Meanwhile , it does not need a extra time to be carried out . it can continuously work during the excavation of trenches , so whole work cycle can be reduced . anchors and layers of shot concrete have replaced the traditional steel frames and piles , including concrete piles , steel piles , and they can largely economize construction materials , such as steel and concrete , reduce the amount of soil that would be excavated out , and improve work conditions
锚杆施工机械及设备作业空间小,可为各种地形及场地使用,同时,它不独占工期,而随基坑开挖同步、流水进行,节约工期;用锚杆及喷射硅面层代替传统的钢支撑和桩(硅桩、钢板桩) ,能够大量节省钢材、硅等建材,减少土方开挖量且能改善施工条件;其次锚杆的预加应力可以通过抗拔实验来获得。
Similar Words:
"excavated artificial harbour" Chinese translation, "excavated diameter" Chinese translation, "excavated lesion depressed lesion" Chinese translation, "excavated matcrial" Chinese translation, "excavated material" Chinese translation, "excavated rock and soil volume" Chinese translation, "excavated rock slope" Chinese translation, "excavated section" Chinese translation, "excavated section of road" Chinese translation, "excavated spoil" Chinese translation